Our Selected Experiences
Feasibility Study dan Business Plan 2020 - 2021
- CustomerProject
-
PT Sucofindo – Kementerian Perindustrian
Preparation of the IVO/ILO Industrial Business Plan to support the Green Gasoline Stand Alone Industry Made from Palm Oil.
-
PT Kaltim Parna Industri
Pre-Feasibility Study of Bio-aromatics Plant.
-
PT Luas Birus Utama
Feasibility Study of Amine Cluster Plant.
-
Institut Teknologi Bandung
Technoeconomic Study on the Implementation of Green Diesel and Bioavtur Production Made from IVO.
-
BPPT
The Feasibility Study of Industrial Vegetable Oil (IVO) which Integrated with Independent People's Gardens in the District Pelalawan.
-
PT Energy Management Indonesia (Persero)
Pre-Feasibility Study Consultant Services for Methanol Plants in PT Perusahaan Gas Negara (PGN) Tbk.
-
PT Perusahaan Pengelola Aset (Persero)
Business and Industry Studies and Financial Projection Review PT Cisadane Raya Chemical (PT CRC).
- CustomerProject
-
PT Buana Indah Mandiri (PT SMART Tbk. group)
Feasibility Study (FS) of Biogas Power Plant Project (PLTBg) 2x5 MWe and Biomass Power Plant (PLTBm) 2x5 MWe in Bangka Belitung Province.
-
PT Biogreen Power Jayapura (Korindo Group)
Feasibility Study for Biogas Power Plant Project (PLTBg) Based on Palm Oil Mill Liquid Waste in Asiki Papua.
-
PT Pasadena Biofuels Mandiri
Feasibility Study of 7 MW Biomass Power Plant in Ujung Batu, Rokan Hulu Regency, Riau Province.
Feasibility Study of 3 MW Biomass Power Plant in Ujung Batu, Rokan Hulu Regency, Riau Province.
-
First Resources Group
Feasibility Study of Biogas Power Plant in Kabupaten Rokan Hulu, Riau Province.
-
Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi
Potential Feasibility Study, Detailed Engineering Design and Preparation institutions for the Development of POME Biogas Power Plants in the region Palm oil plantations for commercial and rural communities (On Grid).
Potential Feasibility Study, Detailed Engineering Design and preparation Institutional development of Biomass PLT (On Grid).
- CustomerProject
-
Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi
Potential Feasibility Study, Detailed Engineering Design and Preparation Institutions for the Development of POME Biogas Power Plants in the Region Oil Palm Plantation to Electrify Village Communities (On Grid).
Bioavtur Business Study.
-
PT Bioenergi Pratama Jaya
Details of Feasibility Study for Integrated Palm Oil Processing to Produce Biodiesel and Power Generation Biomass.
-
Direktorat Jenderal Pengendalian Pencemaran dan Kerusakan Lingkungan KLHK
Biogas PLT Development Planning Package in Desa Rantau Sakti (FS Compilation).
-
PT INCO
Determination of SO2 Management Solution.
Feasibility Study dan Business Plan 2016 - 2018
Feasibility Study dan Business Plan 2010 - 2015
Technical Due Diligence & Plant Assessment 2017 - 2021
- CustomerProject
-
PT Ernst & Young Indonesia
Technical and Environmental Due Diligence (TEDD) on PT Mercedes-Benz Indonesia and PT Mercedes-Benz Distribution Indonesia (Daimler Indonesia).
-
PT Pupuk Kujang
Lifetime Assessment Services for Kujang Factory 1A.
-
ECO Resources Trading Limited
Technical Due Diligence of CPO Facilities, Soil Investigation and Topography Survey for PAO Treatment Plant Development Project.
-
PT PricewaterhouseCoopers Consulting Indonesia (PwC)
Technical Study of PT Perkebunan Nusantara's Sugar Factory Business III (Persero) (PTPN III).
-
PT Mount Dreams Indonesia
Technical Audit Services Paper Factory.
-
PT Cisadane Raya Chemicals
Technical Audit Services Oleochemical Plant.
-
PT Royal Industries Indonesia
Technical Audit Services of PT Royal Industries Indonesia Plant – Karawang.
Engineering, Procurement, Construction, Commissioning 2013 - 2023
- CustomerProject
-
Direktorat Jenderal Energi Baru, Terbarukan dan Konservasi Energi
EPC Biomass Gasification from Rice Husk Biomass to Electricity 30 kw in Sumba, NTT.
EPC Biomass Gasification from Rice Husk Biomass to Electricity 30 kw in Sumba, NTT.
EPC Biogas Power Plant (POME) 1 MW in Rokan Hulu, Riau.
EPC Biogas Power Plant (POME) 1 MW in Pagar Merbau, Medan, North Sumatera.
-
PT Pasadena Biofuels Mandiri
Biogas Plant in Ujung Batu, Rokan Hulu, Riau.
-
BPPT – PTPN V
Biogas Power Plant (0.7 MW – Palm Oil Mill) in Terantam, Riau.
-
BBSPJIA – Kementrian Perindustrian
Research and Development Activities for Oil Palm Empty Bunch Fractionation Technology on a Pilot Plant Scale.
Engineering Design 2013 - 2020
- CustomerProject
-
PT Ecolab International Indonesia
Engineering Works Package for WWTP System PT Croda Indonesia.
-
Cargill Tropical Palm
Detail Engineering Design for Biogas in CPO Plant (Refinement) in KDIM, Manis Mata, Ketapang, West Kalimantan (Collaboration with PT Pasadena Engineering Indonesia).
-
RSUD Balaraja
Engineering Hydrant Design.
-
Korindo Group
Detail Engineering Design for CPO Mill in Halmahera (Collaboration with PT Pasadena Engineering Indonesia).
-
Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi
Potential Feasibility Study, Detailed Engineering Design and Preparation institutions for the Development of POME Biogas Power Plants in the region Palm oil plantations for commercial and rural communities (On Grid).
Potential Feasibility Study, Detailed Engineering Design and preparation Institutional development of Biomass PLT (On Grid).
Potential Feasibility Study, Detailed Engineering Design and Preparation Institutions for the Development of POME Biogas Power Plants in the Region Oil Palm Plantation to Electrify Village Communities (On Grid).
-
PT Bioenergi Pratama Jaya
Details of Feasibility Study and Basic Engineering Design Processing Integrated Palm Oil to Produce Biodiesel and Biomass Power Plant.
-
Badan Teknologi Nasional
Procurement of Basic Engineering Design (BED) Services Slag II Processing and Detailed Engineering Design Services (DED) Slag Processing II.
-
Direktorat Jenderal Minyak & Gas Bumi, Kementerian ESDM
Front End Engineering Design (FEED) & Detailed Engineering Design (DEDC) Construction of Natural Gas Networks for Households in Batam.
Environmental Document 2011 - 2021
- CustomerProject
-
PT Ernst & Young Indonesia
Environmental Due Diligence (TEDD) on PT Mercedes-Benz Indonesia and PT Mercedes-Benz Distribution Indonesia (Daimler Indonesia).
-
PT Fajar Surya Wisesa Tbk
Preparation of Changes to the Function Recovery Plan Document Environment.
Consulting Services and Preparation of Plan Document Changes Restoration of Environmental Functions for Contaminated Land and Planning for Procurement of Tools ("Amendments to DRPFLH and FEED").
Consultancy Services and Preparation of Recovery Plan Documents Environmental Functions for Contaminated Land.
-
Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi
Study of Emission Level Calculation & Verification Model Development Greenhouse Gases in Bioenergy.
-
Kementerian Lingkungan Hidup
Television and Electronic Waste Management Inventory Computers in Indonesia.
Procurement and Operation Consultant 2014 - 2015
- CustomerProject
-
Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi, Kementerian Energi dan Sumber Daya Mineral
Power Plant Operation Implementation Consultancy Biogas Power at Merbau Fence.
Power Plant Operation Implementation Consultancy Biogas Power in Rokan Hulu.
-
BP, Berau Ltd
Procurement of Bio Diesel Miniplant and Laboratory Equipment.
Management Consulting and Survey Services 2011 & 2020
- CustomerProject
-
BPPT
BPPT Achievements in 2019 - 2015.
BPPT Program Planning Alignment Activities towards National Development Plan for Defense and Security.
Activities to Increase the Role of Application of Technology Intermediation BPPT Based on Law.
Study of the Framework for Measurement of the Readiness of Activities in Science Areas and BPPT Technology.
Review of Strategic Plan Alignment with RPJMN.
-
Kementerian Perindustrian
Oil-based Industrial Material Flow Improvement Study and Gas.
-
Direktorat Jenderal Minyak & Gas Bumi, Kementerian ESDM
Survey on the Use of Gas Fuel for the Transportation Sector Java Bali Region.
-
Direktorat Jenderal Energi Baru, Terbarukan dan Konservasi Energi
Vegetable Fuel Specification Check.
